Part 135 SMS, training, and compliance guidance.
Clear, practical articles for operators building stronger safety systems, training programs, submissions, and day-to-day operations.
Choose a subject to move directly to the guidance that fits the work in front of you.
Browse subjects ↓FAA Form 8410 - Fillable Airplane Pilot Competency/Proficiency Check
Download a clean, fillable PDF version of the Airplane Pilot Competency/Proficiency Check record used with Part 135 operations.
Open resource ↗Find the form, open the resource page, and download the fillable PDF in one step. The form is designed for use with Part 135 airplane pilot competency and proficiency checking records.
View form details ↗The FAA SMS Deadline Is Approaching: What Part 135 and § 91.147 Operators Need to Do Now
The deadline is getting closer, but SMS compliance is more than writing a manual. Your SMS must fit your operation, be used by your people, and produce evidence that safety risks are being managed.
Read the article ↗Existing Part 135 certificate holders and existing § 91.147 LOA holders covered by the rule must develop, implement, and declare compliance with their SMS by May 28, 2027.
See what implementation evidence looks like ↗Electric aviation and eVTOL market entry
A growing research center for manufacturers, operators, infrastructure developers, investors, and public partners preparing for U.S. deployment.
Each section is built around a practical operator question and links directly to the related articles.
Build safety systems that work in daily operations.
SMS implementation, Part 5 readiness, risk controls, assurance evidence, and practical preparation for FAA review.
Starting a Part 135 SMS: Build the Framework First, Then Make It Work
A practical guide for Part 135 and § 91.147 operators to build a scaled Part 5 SMS, prepare the declaration of compliance, work with the POI, and stay ready for FAA DCTs and surveillance.
Read the article ↗Part 135 SMS Readiness: Can You Demonstrate That It Works?
The FAA is looking beyond whether an SMS manual exists. Part 135 managers should be ready to show how a real event moved from report to risk control and closure.
Read the article ↗The Safety Manager Cannot Own the SMS Alone
A safety manager can coordinate the program, but an SMS depends on decisions and follow-through across the operation. Here is how leaders can make accountability clear before the 2027 deadline.
Read the article ↗The FAA SMS Deadline Is Approaching: What Part 135 and § 91.147 Operators Need to Do Now
The deadline is getting closer, but SMS compliance is more than writing a manual. Your SMS must fit your operation, be used by your people, and produce evidence that safety risks are being managed.
Read the article ↗Your SMS Manual Is Not the Test: Preparing a Smaller Part 135 Operation
A practical guide for smaller operators that need to build an SMS, bring a manual back into daily use, and prepare to demonstrate that the system works.
Read the article ↗What Is the FAA Part 60 Flight-Simulator Information Collection—and Why Is It Being Reinstated?
The FAA is reinstating the information collection used to support simulator qualification, training, testing, and checking. Here is what Part 135 operators and Part 142 training centers should understand.
Read the article ↗Make qualification evidence easier to review.
Guidance for training programs, records, checking standards, instructor oversight, and contract check airman readiness.
How to Review a Part 135 Training Program Before It Creates Rework
A practical review method for finding gaps between the approved program, actual training delivery, checking standards, and qualification records.
Read the article ↗Part 135 Contract Training: Why an A031 Standardization Review Matters
Why Part 135 operators should build contract-training reviews around OpSpec A031, the approved training program, and early POI involvement.
Read the article ↗Build a Part 135 Check Airman Packet Around the Qualification Story
A strong check airman packet does more than collect certificates and training records. It connects the individual’s qualifications, requested duties, aircraft or FSTD, training history, and operator oversight into one clear story.
Read the article ↗Prepare for the work behind the submission.
DCT readiness, A031 reviews, manuals, operational control, corrective actions, and the evidence that supports dependable operations.
Can You Sell a Part 135 Certificate? What Buyers and Sellers Need to Understand
Buying or selling a Part 135 operation is not as simple as transferring an FAA certificate. Understand the entity, approvals, people, aircraft, and transition risks before closing.
Read the article ↗Can a Part 135 Operator Change FSDOs? How an FAA Office Change Works
Why responsible-office changes require an operational basis, FAA coordination, and a controlled transfer of open oversight work.
Read the article ↗Plan for new aircraft, new missions, and new expectations.
Field notes on eVTOL, advanced air mobility, emerging training models, and the operational systems that support safe growth.
Start a New Part 135 Certificate—or Add eVTOL to One That Already Exists?
The first successful eVTOL launch may come from an operator that already knows how to manage operational control, training, maintenance, records, and FAA oversight. But the 25-hour proving program is only one part of the approval path.
Read the article ↗Can eVTOL Fly IFR? The Better Question Is Whether It Can Complete the Trip
Instrument capability, icing approval, reserves, alternates, charging, and passenger recovery will determine whether an eVTOL service is a dependable transportation product—not simply whether the aircraft can enter the clouds.
Read the article ↗Cheap Electricity Will Not Make eVTOL Profitable
Electricity may be one of the smallest line items in an eVTOL trip. Profitability will depend on aircraft cost, utilization, pilots, mechanics, batteries, charging, reliability, recovery, and how many seats actually produce revenue.
Read the article ↗Before the First Passenger Boards, Who Owns the Decision to Stop?
An eVTOL trip can depend on the aircraft, pilot, charging, landing site, weather, and ground support. Operators need clear authority and a workable recovery plan when one link changes.
Read the article ↗What eVTOL Operators Can Learn from Disciplined Training Systems
How emerging powered-lift operators can build repeatable training, checking, records, and assurance before rapid growth makes weak controls harder to correct.
Read the article ↗Are We Training Today’s Pilots for Yesterday’s Airplanes?
eVTOL and powered-lift operators should test whether their training system teaches the operational decisions of the new aircraft—not just the habits of the old ones.
Read the article ↗Does 1,500 Hours Still Mean What We Think It Means in an eVTOL Cockpit?
The 1,500-hour milestone may remain a useful qualification gate, but it does not by itself show that a pilot is ready for powered-lift automation, transition, energy management, or operational control.
Read the article ↗Use the articles to start the conversation.
If the topic matches a current project, Easy Star Aviation Intelligence can help you apply the ideas to your operation, records, people, and timeline.
Discuss your operation ↗